六彩开奖网站

Recommended products: FRP water tank
FRP water tank
六彩开奖网站 | Set 六彩开奖网站│Add to Favorites
13784857651 Service Hotline: 13784857651
Popular searches: FRP tanks | FRP tanks
Hebei Jushi Environmental Protection Equipment Co., Ltd.
Contact: Manager Mao
Phone: 0318--8386866
Fax: 0318--8386866
Mobile: 13784857751
Email: 496438629@qq.com
Address: 98 Chuangye Road, Zaoqiang County, Hengshui City, Hebei Province
六彩开奖网站: bx-yz.com
FRP water tank
company 六彩开奖网站
What to pay attention to when transporting FRP water tanks

Glass fiber reinforced plastic water tank is a commonly used large-scale water storage equipment. In order to ensure that it can reach its destination safely, it needs to take a series of protection measures during transportation to ensure the integrity of the equipment.

When transporting glass fiber reinforced plastic water tanks, we must first punch wooden boxes. In order to prevent them from being scratched and squeezed, if necessary, each sheet must be wrapped with plastic foam and packed; because the water tank is a "bubble", it is hoisted during transportation. Attention must be paid to prevent collisions to prevent deformation and cracks in the weld. Gravity knocking is strictly forbidden. In the event of an error, it is difficult to repair the scene. The water tank at the pipe connection should be lined with reinforced board protection to increase the strength of the joint. The design of the width and height of the cabinet should take into account the technical specifications allowed for automobile transportation such as highways, tunnels, bridges and culverts. The water tank needs to be reinforced during transportation to prevent it from sliding in the carriage and causing damage to the water tank board.

Weld the bottom plate of the FRP water tank, the welding seam is even and tidy, and there should be no bubbles or welding pits. Assemble the spot welding around the bottom plate of the FRP water tank on the bottom plate. Before assembly, select the module with the corresponding thickness according to the drawing, and knock the sides of the module straight Leveling. The lower side plate is spot welded around the bottom plate first. After the spot is measured, the error of the two diagonal lengths of the surrounding box must not be greater than 2mm. It is necessary to ensure that the entire lower side module that has been spot welded is horizontally and vertically assembled squarely.

Hebei Jushi
Copyright: Hebei Jushi Environmental Protection Equipment Co., Ltd. Mobile phone: 13784857751 Phone: 0318--8386866 Fax: 0318--8386866 Address: No. 98, Chuangye Road, Zaoqiang County, Hengshui City, Hebei Province. Tank Technical Support: Cangzhou Xianyue Network QQ79471598